Talk:Limerick–Ballybrophy railway line

From WikiProjectMed
Jump to navigation Jump to search

Double or Sing;e

With only two trains each way per day, only a single track is needed. But some overbridge(s) are capable of taking two tracks. Which is it? Tabletop (talk) 08:17, 21 February 2013 (UTC)[reply]