Dhaka Mass Transit Company Limited

From WikiProjectMed
Jump to navigation Jump to search

Dhaka Mass Transit Company Limited (DMTCL)
Company typeGovernment-owned company
IndustryRapid transit
Founded3 June 2013; 11 years ago (3 June 2013)
HeadquartersProbashi Kallyan Bhaban (Level-14), 71, 72, Old Elephant Road, Eskaton Garden, Ramna, ,
Area served
Dhaka metropolis and adjoining areas
Key people
M. A. N. Siddique
OwnerGovernment of Bangladesh
ParentDhaka Transport Coordination Authority
DivisionsRoad Transport and Highways Division
Websitedmtcl.gov.bd

Dhaka Mass Transit Company Limited, commonly known as DMTCL, is a government-owned company responsible for operating Dhaka Metro Rail, a mass rapid transit system in Dhaka and adjoining areas. The company was established on 3 June 2013 under the Companies Act 1994, a law that governs companies in Bangladesh.[1] Out of 5 metro lines planned by the DMTCL, the MRT Line-6 was inaugurated on 28 December 2022 by the Prime Minister Sheikh Hasina.[2]

Vision

Moving People, Saving Time and Environment [3]

Mission

To reduce the traffic congestion by providing a fast, safe, reliable, air-conditioned, time-saving, electricity-driven, environment-friendly and remote-controlled public transport system for Dhaka and its adjoining areas. [3]

Time-bound Action Plan 2030

Bangladesh Government has undertaken the following Time-bound Action Plan 2030 to establish a state-of-the-art robust Mass Rapid Transit (MRT) Network consisting of 6 (Six) Metro Rail routes which will have 104 stations along the total length of 128.741 kilometers line under Dhaka Mass Transit Company Limited (DMTCL). [3]

Time-bound Action Plan 2030
SL Name of MRT Route Phase Projected year of completion Type
1 MRT Line-6 * First 2025 Elevated
2 MRT Line-1 Second 2026 Elevated

and

Underground

3 MRT Line-5: Northern Route 2028
4 MRT Line-5: Southern Route Third 2030
5 MRT Line-2
6 MRT Line-4

* In compliance with the Honorable Prime Minister’s directives works for the extension of MRT Line-6 from Motijheel to Kamlapur is ongoing. [3]

Metro Rail Network Map for Dhaka and its adjoining areas

Dhaka Metro Rail Network

Route length and stations

The total length of Mass Rapid Transit or Metro Rail Network that is being implemented adhering the Time-bound Action Plan 2030 under Dhaka Mass Transit Company Limited (DMTCL) is 140.701 Kilometers. There will be 67 stations. The Route-based details are as follows: [4]

Name of MRT Line Length in Kilometer [4] Number of Station [4]
Total Elevated Underground Total # Elevated Underground
MRT Line-6 21.26 21.26 - 17 17 -
MRT Line-1 31.241 11.369 19.872 21 07 14
MRT Line-5:

Northern Route

20.00 06.50 13.50 14 05 09
MRT Line-5:

Southern Route

17.20 04.10 13.10 15 04 11
MRT Line-2* 35.00 To be finalized after Feasibility Study
MRT Line-4 * 16.00
Grand Total 140.701

* Approximate Length

Station Names and Route alignment of Metro Rail Lines under Mass Rapid Transit (MRT) Network of Dhaka

MRT Line-6 [5]

Uttara North – Uttara Center – Uttara South – Pallabi – Mirpur 11- Mirpur 10- Kazipara – Shewrapara – Agargaon – Bijoy Sarani – Farmgate – Karwan Bazar – Shahbagh – Bangladesh Secretariat – Motijheel – Kamlapur

MRT Line-1 [6]

  • Airport Route: Airport - Airport Terminal 3 – Khilkhet – Nadda – Natun Bazar -  North Badda – Badda – Aftab Nagar – Rampura – Malibag – Rajarbag – Kamlapur
  • Purbachal Route: Joar Sahara – Boalia – Mostul – Sheikh Hasina Cricket Stadium – Purbachal Center -  Purbachal East – Purbachal Terminal

MRT Line-5: Northern Route [7]

Hemayetpur – Baliarpur – Bilamalia – Amin Bazar – Gabtoli – Dar-us-Salam – Mirpur 1 – Mirpur 10 – Kochukhet – Banani – Gulshan 2 – Natun Bazar - Vatara

Line-5: Southern Route [8]

Gabtoli – Technical – Kallyanpur – Shyamoli – College Gate – Asad Gate – Russel Square – Karwan Bazar – Hatirjheel – Tejgaon – Aftab Nagar – Aftab Nagar Center – Aftab Nagar East – Nasirabad – Dasherkandi

MRT Line-2 (Proposed Route) [9]

  • Main Line

Gabtoli – Dhaka Udyan – Mohammadpur Bus Stand – Jhigatola – Science Laboratory – New Market – Azimpur – Palashi – Dhaka Medical College – Gulistan – Motijheel – Kamlapur – Manda – Dakhshingaon – Damripara – Signboard – Bhuighor – Jalkuri – Narayangonj Zilla Sadar

  • Branch Line

Gulistan – Naya Bazar – Sadarghat

MRT Line-4 (Proposed Route) [10]

Kamlapur – Sayedabad – Jatrabari – Shonir Akhra – Signboard – Chattogram Road – Kanchpur – Madanpur

References

  1. ^ Express, The Financial. "Metro rail company functioning without paid-up capital". The Financial Express. Retrieved 28 December 2022.
  2. ^ Tribune, Dhaka (21 December 2022). "PM Hasina will be first passenger of metro rail on Dec 28". www.dhakatribune.com. Retrieved 28 December 2022.
  3. ^ a b c d "At a Glance-Dhaka Mass Transit Company Limited". DMTCL Website. 2024-06-04. Retrieved 2024-06-04.{{cite web}}: CS1 maint: url-status (link)
  4. ^ a b c "At a Glance-Dhaka Mass Transit Company Limited". DMTCL Website. 2024-06-09. Retrieved 2024-06-09.{{cite web}}: CS1 maint: url-status (link)
  5. ^ "MRT Line-6 or First Elevated Metro Rail of Bangladesh". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.{{cite web}}: CS1 maint: url-status (link)
  6. ^ "Route Alignment of MRT Line-1". DMTCL Website. 2023-10-04. Retrieved 2023-10-04.{{cite web}}: CS1 maint: url-status (link)
  7. ^ "Route Alignment of MRT Line-5: Northern Route". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.{{cite web}}: CS1 maint: url-status (link)
  8. ^ "Route Alignment of MRT Line-5: Southern Route". DMTCL Website. 2023-11-29. Retrieved 2024-06-04.{{cite web}}: CS1 maint: url-status (link)
  9. ^ "Route Alignment of MRT Line-2". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.{{cite web}}: CS1 maint: url-status (link)
  10. ^ "Route Alignment of MRT Line-4". DMTCL Website. 2023-10-04. Retrieved 2024-06-04.{{cite web}}: CS1 maint: url-status (link)