Bihai Power Plant
Bihai Power Plant 碧海發電廠 | |
---|---|
Country | Republic of China |
Location | Xiulin, Hualien County |
Coordinates | 24°20′09″N 121°40′36″E / 24.33583°N 121.67667°E |
Status | Operational |
Construction began | 2001 |
Commission date | 10 December 2011[1] |
Construction cost | NT$ 16.5 billion |
Owner(s) | Taipower |
Operator(s) | Taipower |
Thermal power station | |
Primary fuel | Water |
Power generation | |
Units operational | 1 |
Make and model | Tatung Company, BHEL[2] |
Nameplate capacity | 61.2 MW |
Annual net output | 237 GWh |
External links | |
Commons | Related media on Commons |
The Bihai Power Plant (traditional Chinese: 碧海發電廠; simplified Chinese: 碧海发电厂; pinyin: Bìhǎi Fādiànchǎng) is a hydroelectric power plant in Xiulin Township, Hualien County, Taiwan.
History
The geological survey and exploratory drilling for the project were started in 1996 and construction was started in 2001. After 15 years of preparatory and construction work, the power plant went into commercial operation on 10 December 2011.[3]
Dam and reservoir
The power plant was established from the construction of concrete gravity dam at an altitude of 545 meters along the Hoping River basin in Hualien County. The dam at (24°19′59.91″N 121°36′25.48″E / 24.3333083°N 121.6070778°E) created a reservoir with a capacity of 635,000 m3. An intake valve was built connecting the dam with a 6,549 meter long headrace tunnel to Bihai Power Plant located at the downstream side at an altitude of 100 meters where a vertical Pelton turbine of 61.2 MW is installed.
Generation
The power plant is expected to generate 237 GWh every year to residents of Hualien County to relieve the previous burden for Taipower to import electricity from Mingtan Pumped Storage Hydro Power Plant in Nantou County and Maanshan Nuclear Power Plant in Pingtung County which was very costly. The 18 hours of daily water capture and storage will generate enough electricity to supply the six hours of peak load in the region.
Safety
The power plant will open the floodgate to release excessive water during high river intensity to prevent the buildup of sediment.
Financing
The project costed NT$ 16.5 billion.[citation needed]
See also
References
- ^ "Taiwan power companyConstruction Project". Taipower.com.tw. Archived from the original on 8 May 2014. Retrieved 26 May 2014.
- ^ "Bharat Heavy Electricals Ltd". Bhel.com. Retrieved 26 May 2014.
- ^ "Taiwan Today - Hualien hydropower plant ready to operate in October". Archived from the original on 27 May 2014. Retrieved 23 August 2014.
- Pages using gadget WikiMiniAtlas
- Articles with short description
- Short description matches Wikidata
- Use dmy dates from January 2021
- Infobox mapframe without OSM relation ID on Wikidata
- Coordinates on Wikidata
- Thermal power station articles using Infobox power station
- Articles containing traditional Chinese-language text
- Articles containing simplified Chinese-language text
- All articles with unsourced statements
- Articles with unsourced statements from May 2021
- Commons category link from Wikidata
- Lists of coordinates
- Geographic coordinate lists
- Articles with Geo
- 2011 establishments in Taiwan
- Buildings and structures in Hualien County
- Dams completed in 2011
- Energy infrastructure completed in 2011
- Hydroelectric power stations in Taiwan
- Pages using the Kartographer extension